Whitney-Tisdale Pump Station Bypass Report (2) 

Whitney-Tisdale Pump Station # 4 Bypass Report

Address: 5121 Highway 101 East

Start date: August 29, 2021

Start time: 18:15

End date: August 29, 2021

End time: 19:30

Volume by-passed: 250 m3

Considerations for Healthy Use of Local Beaches and Water Ways:

It is not recommended to swim for two days after a heavy rainfall as this can cause high levels of bacteria in the water. Beach conditions can change frequently as a result of environmental factors and weather conditions such as heavy rain, wind condition, and presence of birds and aquatic life.

Posted by Vickie Boudreau On 8/30/2021 at 11:23 AM  

 