Phase 1 of Connecting Link Construction Starts Monday 
Please be advised that Algonquin Blvd. W. will be reduced to one lane in both directions at Mattagami Blvd. South starting this Monday, April 19.

The lane reduction represents the start of Phase 1 of the Connecting Link Segment 5 construction and will see Mattagami Blvd. South closed between Algonquin Blvd. West and Wilson Ave.

Sign up today for our Connecting Link alerts and get the latest information on the Connecting Link construction straight to your phone. Visit Timmins.ca > News and Alerts > Connecting Link.
Posted by Amanda Dyer On 4/14/2021 at 12:53 PM  

 
  • © 2018 City of Timmins. All Rights Reserved.