Public Advisory: Paving and Roadwork 
The City of Timmins wishes to advise residents that work on our annual paving program will begin on May 26, 2021 at 6 p.m.

The City is working with Miller Paving to provide partial depth road maintenance to remove and replace the surface layer of asphalt on the program’s approved list of roads, otherwise known as grind and pave work. Partial depth road maintenance is a cost effective way to extend a road’s lifespan.

It is anticipated that work will be completed by the end of October 2021. All streets due for maintenance will remain open during this project. Roadwork is not scheduled by date and location at the start of the paving season. Instead, Miller Paving will schedule work on nearby roads around the same time so they can easily move equipment.

We are asking motorists to proceed with caution when traveling through any and all construction areas, ensuring the safety of everyone involved.
Posted by Amanda Dyer On 5/21/2021 at 3:21 PM  

 
  • © 2018 City of Timmins. All Rights Reserved.