Public Consultation Over Bridge Scheduled for July 4, 2022 
The City of Timmins is encouraging residents to attend a Public Information Centre (PIC) on transportation alternatives for the Porcupine River corridor on Monday, July 4, 2022.

The Porcupine River Bridge on Frederick House Lake Rd. was closed last November over concerns of safety and structural integrity. Since then, the City has been working with Associated Engineering to come up with a permanent solution for the transportation corridor.

Associated Engineering will now present three (3) possible design options that include replacement of the bridge on Frederick House Lake Rd., permanent detour around the closed structure or a new road alignment east of the Porcupine River. This is an important opportunity for residents and interested parties to provide public input on each transportation alternative.

Public Information Centre
Date: Monday, July 4th, 2022
Time: 6:30 p.m. -8:30 p.m.
Location: Hoyle Community Center
    25 Hoyle Rd.
    Porcupine, ON P0N 1H0

The PIC will consist of an open house format with City staff and technical representatives on hand to answer any questions.

The City of Timmins thanks residents for their participation in improving its active infrastructure.
Posted by Amanda Dyer On 6/23/2022 at 3:36 PM  

 
  • © 2018 City of Timmins. All Rights Reserved.