Surface Treatment on Sandy Falls Monday September 28 and Tuesday September 29, 2020  

The City of Timmins Engineering Department would like to advise the Public of the Surface Treatment Operation on Sandy Falls Rd,  Monday, September 28 and Tuesday, September 29, 2020. Traffic controls will be in place and drivers are being asked to slow down and proceed with caution in the active work zone. 

We thank you for your patience and cooperation during this time.

Engineering Department

Posted by Vickie Boudreau On 9/23/2020 at 1:35 PM  

 
  • © 2018 City of Timmins. All Rights Reserved.