﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Recent Posts from Blog Notices of Disruption</title>
    <description>&lt;br&gt;</description>
    <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072</link>
    <atom:link href="https://www.timmins.ca:443/syndication/rss.aspx?serverid=11976345&amp;userid=5&amp;feed=blogposts&amp;key=IRgmvYApEgevxbpQ1YnSg5mzmSfJM9NXqyrxl1vtDMv4nvCa876aEKMcGcdmeY%2F3U948X8fWtIAnCWQCgs27E9sW1lY%3D&amp;blog_id=14914072&amp;v=2.0" rel="self" type="application/rss+xml" xmlns:atom="http://www.w3.org/2005/Atom" />
    <item>
      <title>Update to Bulk Item Collection – Environmental Services – May 14, 2026</title>
      <description>&lt;p&gt;Please be advised that the Environmental Services Department is continuing bulk item collection within the following areas that was scheduled for today. Area:
• All areas South of Algonquin Blvd., starting at Mattagami River, working east to Railway St., including Dalton Rd. (up until the end of the asphalt) Collection efforts are on-going and may take additional time to complete due to volume and operational requirements. Residents are asked to leave their items at the curb, and crews will return to collect remaining materials as work progresses.

Please note: All areas North of Ross &amp; Jubilee, Starting at Airport Road (including rural areas) and working east to HWY 655 have been completed.

We understand this may cause some inconvenience and appreciate your patience as we work to complete the collection. Updates will be provided as needed. Thank you for your understanding&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21292529&amp;portletAction=viewpost</link>
      <author>Sara Perron</author>
      <guid isPermaLink="false">11976345_21292529</guid>
      <pubDate>Thu, 14 May 2026 19:32:00 GMT</pubDate>
    </item>
    <item>
      <title>Update to Bulk Item Collection – Environmental Services – May 13, 2026</title>
      <description>&lt;p&gt;
Please be advised that the Environmental Services Department is continuing bulk item collection within the following areas that was scheduled for today.

 Area:
• All areas North of Ross Ave &amp; Jubilee Ave; Starting at Airport Rd (including rural areas) and working east to HWY 655 
Collection efforts are ongoing and may take additional time to complete due to volume and operational requirements. Residents are asked to leave their items at the curb, and crews will return to collect remaining materials as work progresses.

 
We understand this may cause some inconvenience and appreciate your patience as we work to complete the collection.
Please note that those areas east of college street have been completed. 

 
Updates will be provided as needed.
Thank you for your understanding.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21291331&amp;portletAction=viewpost</link>
      <author>Sara Perron</author>
      <guid isPermaLink="false">11976345_21291331</guid>
      <pubDate>Wed, 13 May 2026 19:34:00 GMT</pubDate>
    </item>
    <item>
      <title>Bulk Item Collection – Environmental Services – May 12, 2026</title>
      <description>&lt;p&gt;
Please be advised that the Environmental Services Department is continuing bulk item collection within the following areas that was scheduled for today.

 Areas:   North of Ross &amp; Jubilee, Starting at Airport Road (including rural areas) and working east to HWY 655
  
Collection efforts are ongoing and may take additional time to complete due to volume and operational requirements. Residents are asked to leave their items at the curb, and crews will return to collect remaining materials as work progresses.

 
We understand this may cause some inconvenience and appreciate your patience as we work to complete the collection.
Please note that all of Schumacher through Gold Centre and all areas of on and off Goldmine Rd. (Carium Rd., Delnite, MacDonald Hill, and Buffalo Ankerite) had been completed.

 
Updates will be provided as needed.

 
Thank you for your understanding.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21289835&amp;portletAction=viewpost</link>
      <author>Sara Perron</author>
      <guid isPermaLink="false">11976345_21289835</guid>
      <pubDate>Tue, 12 May 2026 20:06:00 GMT</pubDate>
    </item>
    <item>
      <title>Notice of Disruption - Street Sweeping Week of May, 2026 11</title>
      <description>&lt;p&gt;
Timmins, ON – City of Timmins Public Works is declaring changes to the street sweeping schedule for the week of May 11, 2026.

 Areas being affected due to operational issues:

Monday, May 11, 2026
Night Shift Timmins – scheduled– McIntyre Roads, Schumacher Highway – 655 to Carium Rd. will be re-scheduled for a later date.

We thank you for your cooperation in this matter.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21289695&amp;portletAction=viewpost</link>
      <author>Becky Cashmore</author>
      <guid isPermaLink="false">11976345_21289695</guid>
      <pubDate>Tue, 12 May 2026 18:23:00 GMT</pubDate>
    </item>
    <item>
      <title>Water Control for Connecting Link Segment 13 – Environmental Service – May 7, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department, wishes to advise the public of scheduled water control testing for Connecting Link Segment 13 construction within the following area:

 South Porcupine Area:
• Highway 101 E. between Bristol Rd. and Ruth St.

Date and Time of Disruption:
• May 7, 2026, from 9:30 a.m. to 10:00 a.m. 
Once shutdown, and if testing is successful, the water will only be “OFF” for 10 to 15 minutes.  Once control is confirmed, water will be restored to normal. 

 
This work is being done to prepare for construction on Segment 13 of the Connecting Link. Environmental Services is testing the water valves to ensure they can get proper control for upcoming work. An update will be provided once a construction start time has been confirmed.

 
During the date and time of the disruption, homeowners and businesses may experience short-term loss in water and pressure, or experience brown or rust-coloured water. It is recommended not to drink or wash laundry with the discoloured water. While it is not harmful to your health, it can stain laundry. Should this occur, it is advised to turn off your tap for 10-20 minutes in order to allow crews to finish. Once the work is completed, turn on the COLD water tap closest to the source (usually your laundry tub tap) and let it run for approximately 15-20 minutes or until the water colour has returned to normal.

Environmental Service Department would like to thank residents for their patience and cooperation during this work.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21284745&amp;portletAction=viewpost</link>
      <author>Sara Perron</author>
      <guid isPermaLink="false">11976345_21284745</guid>
      <pubDate>Wed, 06 May 2026 18:44:00 GMT</pubDate>
    </item>
    <item>
      <title>Update – Temporary Landfill Closure – Environmental Services – May 4, 2026</title>
      <description>&lt;p&gt;
Evelyn Township Landfill – Temporary Closure

Please be advised that the Environmental Services Department is informing residents that the Evelyn Township Landfill will remain closed due to excessive snow accumulation, which has made access to the site unsafe and impractical.

 
The site was reassessed on Monday, May 4, 2026, and will remain closed until May 11, 2026, at which time it will be reassessed again. We understand this may cause inconvenience and updates will be provided as soon as access is possible, and it is safe to reopen.

 Environmental Service Department would like to thank residents for their patience and understanding while we continue to monitor the conditions.&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21279265&amp;portletAction=viewpost</link>
      <author>Sara Perron</author>
      <guid isPermaLink="false">11976345_21279265</guid>
      <pubDate>Mon, 04 May 2026 14:16:00 GMT</pubDate>
    </item>
    <item>
      <title>Whitney-Tisdale Water Pollution Control Plant Secondary Bypass Report – April 28, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Whitney-Tisdale Water Pollution Control Plant Secondary Bypass

Address: 815 Gervais Street
Start date: April 28, 2026
Start time: 8:01 AM
End date: May 1, 2026
End time: 12:55 PM
Volume by-passed: 9,721 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21272968&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21272968</guid>
      <pubDate>Tue, 28 Apr 2026 13:05:00 GMT</pubDate>
    </item>
    <item>
      <title>Temporary Landfill Closure – Environmental Services – May 1, 2026</title>
      <description>&lt;p&gt;
Evelyn Township Landfill – Temporary Closure

 
Please be advised that the Environmental Services Department, Waste Management Division is informing residents that the Evelyn Township Landfill will remain closed due to excessive snow accumulation, which has made access to the site unsafe and impractical.

 
We understand this may cause inconvenience and appreciate your patience as we monitor conditions. The site will be reassessed on Monday May 4, 2026, and updates will be provided as soon as access is possible and safe to reopen.

 
Environmental Service Department would like to thank residents for their patience and understanding while we wait for the site to become safe.
&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21277750&amp;portletAction=viewpost</link>
      <author>Sara Perron</author>
      <guid isPermaLink="false">11976345_21277750</guid>
      <pubDate>Fri, 01 May 2026 13:04:00 GMT</pubDate>
    </item>
    <item>
      <title>Road Closed - Public Works - April 29, 2026 - Jaguar Drive North</title>
      <description>&lt;p&gt;
Road Closure – Jaguar Drive North

 
Jaguar Drive North is CLOSED with no through traffic 1.25 km north of Riverside Drive due to a culvert washout.

Residents and users are requested access all addresses starting 660 Jaguar North via Sandy Falls Road.

Road will remain closed until flooding subsides and an assessment can be made.

 
We appreciate your patience and cooperation.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21275300&amp;portletAction=viewpost</link>
      <author>Becky Cashmore</author>
      <guid isPermaLink="false">11976345_21275300</guid>
      <pubDate>Wed, 29 Apr 2026 19:04:00 GMT</pubDate>
    </item>
    <item>
      <title>Whitney-Tisdale Pump Station 4 Overflow Reports – April 27, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Whitney-Tisdale Pump Station #4 Sanitary Sewer Overflow Report.

Address: 5121 Highway 101 East
Start date: April 27, 2026
Start time: 3:03 PM PM
End date: April 29, 2026
End time: 1:53 AM
Volume by-passed: 3178.11 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21272531&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21272531</guid>
      <pubDate>Mon, 27 Apr 2026 19:32:00 GMT</pubDate>
    </item>
    <item>
      <title> Mattagami Water Pollution Control Plant Secondary Bypass Report – April 27, 2026 </title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of a Mattagami Water Pollution Control Plant Secondary Bypass.

Address: 551 Airport Road
Start date: April 27, 2026
Start time: 7:03 PM
End date: April 29, 2026
End time: 11:06 AM
Volume by-passed: 21065.493 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21272966&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21272966</guid>
      <pubDate>Tue, 28 Apr 2026 13:02:00 GMT</pubDate>
    </item>
    <item>
      <title>Road Closed - Public Works - April 29, 2026</title>
      <description>&lt;p&gt;
Road Closure – Ross Avenue

 
Please be advised that Ross Avenue will be closed to traffic from Hart Street to Murray Street to facilitate road paving operations.

 
Date: Wednesday, April 29, 2026
Time: 8:00 AM to 3:00 PM

 
During this time, no through traffic will be permitted. Local access may be limited. Motorists are advised to use the signed detour route. Westerly - Hart to Brousseau to Murray. Easterly - Murray to Brousseau to Hart.

 
We appreciate your patience and cooperation as this necessary work is completed.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21273688&amp;portletAction=viewpost</link>
      <author>Becky Cashmore</author>
      <guid isPermaLink="false">11976345_21273688</guid>
      <pubDate>Tue, 28 Apr 2026 19:33:00 GMT</pubDate>
    </item>
    <item>
      <title>Mattagami Water Pollution Control Plant Raw Sewage Spill  Report – April 24, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Mattagami Water Pollution Control Plant Raw Sewage Spill.

Address: 551 Airport Road
Start date: April 24, 2026
Start time: 8:28 AM
End date: April 24, 2026
End time: 8:53 AM
Volume by-passed: 262.721 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21269920&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21269920</guid>
      <pubDate>Fri, 24 Apr 2026 13:12:00 GMT</pubDate>
    </item>
    <item>
      <title>Mattagami Water Pollution Control Plant Secondary Spill Report – April 24, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Mattagami Water Pollution Control Plant Secondary Spill.

Address: 551 Airport Road
Start date: April 24, 2026
Start time: 8:10 AM
End date: April 24, 2026
End time: 9:12 AM
Volume by-passed: 500.201 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21269922&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21269922</guid>
      <pubDate>Fri, 24 Apr 2026 13:15:00 GMT</pubDate>
    </item>
    <item>
      <title>Mattagami Water Pollution Control Plant Secondary Bypass Report – April 23, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Mattagami Water Pollution Control Plant Secondary Bypass Report.

Address: 551 Airport Road
Start date: April 23, 2026
Start time: 12:15 PM
End date: April 23, 2026
End time: 12:50 PM
Volume by-passed: 226.48 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21269231&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21269231</guid>
      <pubDate>Thu, 23 Apr 2026 19:32:00 GMT</pubDate>
    </item>
    <item>
      <title>Watermain Break Repair – Environmental Service – April 22, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Watermain Break Repair within the following area:

 Schumacher:
• Croatia Ave. between Ponderosa St. to Claimpost Trail
•  Brundy Ave. between Claimpost Trail to Delost Ave.

Date and Time of Disruption:
• April 22, 2026, from 8:00 AM to 8:00 PM 
Homeowners and businesses within the notification area may experience short-term loss in water &amp; pressure or experience brown or rust-coloured water during the disruption. It is recommended not to drink or wash laundry with the discoloured water. While it is not harmful to your health, it can stain laundry. Should this occur, it is advised to turn off your tap for 10-20 minutes in order to allow the crew to finish. Once the work is completed, turn on the COLD water tap closest to the source (usually your laundry tub tap) and let it run for approximately 15-20 minutes or until the water colour has returned to normal.

Environmental Service Department would like to thank residents for their patience and cooperation during this emergency work.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21267591&amp;portletAction=viewpost</link>
      <author>Sara Perron</author>
      <guid isPermaLink="false">11976345_21267591</guid>
      <pubDate>Wed, 22 Apr 2026 12:37:00 GMT</pubDate>
    </item>
    <item>
      <title>Water Valve Maintenance &amp; Repair – Environmental Service – April 22, 2026</title>
      <description>&lt;p&gt;The City of Timmins, Environmental Services Department wishes to advise the public of Water Valve Repair within the following area: Timmins South:
• Moneta Ave. between Spruce St S to Railway St.
• Spruce St S to between Moneta Ave to Sterling Ave. Date and Time of Disruption:
• April 22, 2026, from 7:00 AM to 8:00 PM Homeowners and businesses within the notification area may experience short-term loss in water &amp; pressure or experience brown or rust-coloured water during the disruption. It is recommended not to drink or wash laundry with the discoloured water. While it is not harmful to your health, it can stain laundry. Should this occur, it is advised to turn off your tap for 10-20 minutes in order to allow the crew to finish. Once the work is completed, turn on the COLD water tap closest to the source (usually your laundry tub tap) and let it run for approximately 15-20 minutes or until the water colour has returned to normal.

Environmental Service Department would like to thank residents for their patience and cooperation during this emergency work.&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21266082&amp;portletAction=viewpost</link>
      <author>Sara Perron</author>
      <guid isPermaLink="false">11976345_21266082</guid>
      <pubDate>Tue, 21 Apr 2026 17:49:00 GMT</pubDate>
    </item>
    <item>
      <title>Whitney-Tisdale Pump Station #5 Overflow Reports – April 18, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Whitney-Tisdale Pump Station #5 Raw Overflow Report.

Address: 45 Florence Street
Start date: April 18, 2026
Start time: 9:20 AM
End date: April 18, 2026
End time: 7:20 PM
Volume by-passed: 2450.29 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21264380&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21264380</guid>
      <pubDate>Mon, 20 Apr 2026 15:47:00 GMT</pubDate>
    </item>
    <item>
      <title>Whitney-Tisdale Pump Station #3 Raw Overflow Reports – April 18, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Whitney-Tisdale Pump Station #3 Raw Overflow Report.

Address: 174 Essa Avenue
Start date: April 18, 2026
Start time: 12:54 PM
End date: April 18, 2026
End time: 2:20 PM
Volume by-passed: 86.05 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21264375&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21264375</guid>
      <pubDate>Mon, 20 Apr 2026 15:45:00 GMT</pubDate>
    </item>
    <item>
      <title>Miners Street Pump Station Overflow Reports – April 18, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Miners Street Pump Station Raw Overflow Report.

Address: 1139 Brundy Ave
Start date: April 18, 2026
Start time: 7:19 AM
End date: April 19, 2026
End time: 6:15 AM
Volume by-passed: Unknown

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21264364&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21264364</guid>
      <pubDate>Mon, 20 Apr 2026 15:43:00 GMT</pubDate>
    </item>
    <item>
      <title>Croatia Avenue Pump Station Overflow Reports – April 18, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Croatia Avenue Pump Station Raw Overflow Report.

Address: 177 Croatia Avenue
Start date: April 18, 2026
Start time: 8:32 AM
End date: April 19, 2026
End time: 3:10 AM
Volume by-passed: Unknown

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21264283&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21264283</guid>
      <pubDate>Mon, 20 Apr 2026 15:16:00 GMT</pubDate>
    </item>
    <item>
      <title>Mattagami Water Pollution Control Plant Raw Overflow Report – April 17, 2026 </title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Mattagami Water Pollution Control Plant Raw Overflow Report.

Address: 551 Airport Road
Start date: April 17, 2026
Start time: 7:41 PM
End date: April 19, 2026
End time: 12:40 AM
Volume by-passed: 26087.673 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21264277&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21264277</guid>
      <pubDate>Mon, 20 Apr 2026 15:14:00 GMT</pubDate>
    </item>
    <item>
      <title>Whitney-Tisdale Pump Station #2 Overflow Reports – April 17, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Whitney-Tisdale Pump Station #2 Raw Overflow Report.

 
Address: 57 Evans Street
Start date: April 17, 2026
Start time: 5:50 PM
End date: April 19, 2026
End time: 3:44 AM
Volume by-passed: 7463.41 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21264259&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21264259</guid>
      <pubDate>Mon, 20 Apr 2026 14:56:00 GMT</pubDate>
    </item>
    <item>
      <title>Whitney-Tisdale Pump Station #1 Overflow Report – April 17, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Whitney-Tisdale Pump Station #1 Raw Overflow Report.

Address: 202 Goldrush Street
Start date: April 17, 2026
Start time: 10:00 PM
End date: April 18, 2026
End time: 8:00 PM
Volume by-passed: 1499.032 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.

&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21264231&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21264231</guid>
      <pubDate>Mon, 20 Apr 2026 14:47:00 GMT</pubDate>
    </item>
    <item>
      <title>Mattagami Water Pollution Control Plant Secondary Bypass Report – April 14, 2026  (1)</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Mattagami Water Pollution Control Plant Secondary Bypass Report.

 
Address: 551 Airport Road
Start date: April 14, 2026
Start time: 4:36 PM
End date: April 19, 2026
End time: 5:00 AM
Volume by-passed: 77914.181 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.
&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21262890&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21262890</guid>
      <pubDate>Fri, 17 Apr 2026 13:30:00 GMT</pubDate>
    </item>
    <item>
      <title>Whitney-Tisdale Pump Station #4 Overflow Report – April 14, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of the Whitney-Tisdale Pump Station #4 Raw Overflow Report.

Address: 5121 Highway 101 East
Start date: April 14, 2026
Start time: 10:30 PM
End date: April 19, 2026
End time: 11:55 PM
Volume by-passed: 3811.64 m3

 
Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.
&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21260256&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21260256</guid>
      <pubDate>Wed, 15 Apr 2026 13:11:00 GMT</pubDate>
    </item>
    <item>
      <title>Watermain Break Repair – Environmental Service – April 20, 2026</title>
      <description>&lt;p&gt;The City of Timmins, Environmental Services Department wishes to advise the public of Watermain Break Repair within the following area: Timmins North:
 • Melrose Blvd between Westmount Blvd to Victoria Ave (East side of the street) • Dieppe St between Westmount Blvd to Victoria Ave (West side of the street)  Date and Time of Disruption: • April 20, 2026, from 8:00 AM to 8:00 PM. Homeowners and businesses within the notification area may experience short-term loss in water &amp; pressure or experience brown or rust-coloured water during the disruption. It is recommended not to drink or wash laundry with the discoloured water. While it is not harmful to your health, it can stain laundry. Should this occur, it is advised to turn off your tap for 10-20 minutes in order to allow the crew to finish. Once the work is completed, turn on the COLD water tap closest to the source (usually your laundry tub tap) and let it run for approximately 15-20 minutes or until the water colour has returned to normal.

Environmental Service Department would like to thank residents for their patience and cooperation during this emergency work.
&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21263978&amp;portletAction=viewpost</link>
      <author>Sara Perron</author>
      <guid isPermaLink="false">11976345_21263978</guid>
      <pubDate>Mon, 20 Apr 2026 12:28:00 GMT</pubDate>
    </item>
    <item>
      <title> Whitney-Tisdale Pump Station #2 Overflow Reports – April 16, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of a Whitney-Tisdale Pump Station #2 Raw Overflow Report.

Address: 57 Evans Street
Start date: April 16, 2026
Start time: 4:11 PM
End date: April 17, 2026
End time: 2:14 AM
Volume by-passed: 1393.99 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.
&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21262886&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21262886</guid>
      <pubDate>Fri, 17 Apr 2026 13:27:00 GMT</pubDate>
    </item>
    <item>
      <title>Mattagami Water Pollution Control Plant Secondary Bypass Report – April 16, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of Mattagami Water Pollution Control Plant Raw Overflow Report.

Address: 551 Airport Road
Start date: April 16, 2026
Start time: 5:25 PM
End date: April 16, 2026
End time: 10:53 PM
Volume by-passed: 3522.781 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.
&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21262892&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21262892</guid>
      <pubDate>Fri, 17 Apr 2026 13:33:00 GMT</pubDate>
    </item>
    <item>
      <title>Whitney-Tisdale Pump Station #5 Sewage Spill Report – April 16, 2026</title>
      <description>&lt;p&gt;
The City of Timmins, Environmental Services Department wishes to advise the public of a Whitney-Tisdale Pump Station #5 Sewage Spill Report.

 
Address: 45 Florence Street
Start date: April 16, 2026
Start time: 8:30 PM
End date: April 16, 2026
End time: 8:32 PM
Volume by-passed: 200.02 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system. 

 
Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

 
To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&amp;pageId=20229538

 
City staff would like to thank residents for their assistance in reducing water usage during this time.
&lt;/p&gt;</description>
      <link>https://www.timmins.ca/blog/one.aspx?portalId=14914072&amp;postId=21262909&amp;portletAction=viewpost</link>
      <author>Cyndee Villeneuve</author>
      <guid isPermaLink="false">11976345_21262909</guid>
      <pubDate>Fri, 17 Apr 2026 14:08:00 GMT</pubDate>
    </item>
  </channel>
</rss>