Reduced load restrictions for commercial motor vehicles and trailers will be lifted as of Friday, June 2, 2023 at 4:00 p.m. on applicable roads within the city of Timmins.
Due to on-going construction, commercial motor vehicles are required to use the standard truck detour along Shirley St. to Laforest Rd. and Hwy. 655. The removal of half-load restrictions does not change or alter the approved truck detour route for construction along Riverside Dr. and Algonquin Blvd. Roadways like Jaguar Dr., Government Rd. and Sandy Falls Rd. are not designated as truck routes, and road conditions can deteriorate quickly from repeated heavy truck traffic.
By-law 2006-6275 governs load restrictions to protect our roads and highways during the spring thaw, when damage is most likely to happen. Typically, reduced load restrictions are in place until mid-June and are subject to the provisions of Section 122 of the Highway Traffic Act RSO 1990 Chapter H 8.”
The by-law (https://timmins.civicweb.net/filepro/documents/258?preview=7545) provides a list of the applicable roads under Schedule A.
- Emergency Watermain Break Repair – Environmental Services – July 10, 2025
- Moneta Booster Station Shut down - July 8, 2025
- Hydrant Flushing/Watermain Cleaning - Environmental Services - July 8, 2025
- Hydrant Flushing/Watermain Cleaning - Environmental Services - July 7, 2025
- Emergency Watermain Valve Replacement – Environmental Services – July 7, 2025
- Mattagami River Boat Launch - Closed July 7-8, 2025
- Water Infrastructure Maintenance - Environmental Services - July 2, 2025
- Whitney-Tisdale Pump Station Overflow Reports - June 30, 2025
- Mattagami Water Pollution Control Plant Bypass & Overflow Report - June 30, 2025
- Roads Update: Norman Street
- Emergency Watermain Break Repair– Environmental Services – June 27, 2025
- Whitney-Tisdale Pump Station Overflow Reports
- Mattagami Water Pollution Control Plant Bypass & Overflow Report
- Hydrant Flushing - Environmental Services - June 23, 2025
- Road Closure for Catch Basin Repair – Environmental Services – June 11, 2025
- Mattagami Water Pollution Control Plant Digester Cleaning - Begining June 11, 2025
- Hydrant Flushing – Environmental Services – June 10, 2025
- Notice of Disruption – Road Closure for Catch Basin Repair – June 05, 2025
- Temporary Pool Closure Planned for July and August 2025
- Hydrant Flushing – Environmental Services – May 23, 2025
|