Snow Removal & Street Cleaning


Recent Posts
1  2  3  4 

Night Time Street Sweeping 9:00 PM to 7:30 AM

From May 9 to May 14, the Public Works Department wishes to inform the public that crews may be doing night time street sweeping

Sunday May 9 starting 12:00 AM:

Connecting Link: Bruce, Main, Harold  

Mountjoy: Shirley, Lafleur Bridge, Theriault  

Monday May 10 starting 12:00 AM:

Connecting Link: Highway 101 E, Bruce Y

BIA: Spruce (Sixth to Kirby), Pine (Sixth to Kirby), Cedar (Sixth to Kirby), Balsam (Sixth to First)

Tuesday May 11 starting 12:00 AM:

South Porcupine: Crawford, Golden  

BIA: Third, Birch (Sixth to Second), Maple (Sixth to Second), Elm (Sixth to Second)

Wednesday May 12 starting 12:00 AM:

South Porcupine: Moore, Legion

BIA: Wilson, Commercial

Daytime Street Sweeping 7:30 AM to 4:00 PM

From May 9 to May 14, the Public Works Department wishes to inform the public that crews may be doing day time street sweeping

Monday May 10 starting 7:30 AM:

Timmins North: JV Bonhomme, Brian Romaine, Argento, Mascioli, Logan Kerr, Schneider, Ray Caine, Reg Pope, Graye    

South Porcupine: TBD  

Tuesday May 11 starting 7:30 AM

Timmins North: Dieppe, University, Melrose, Westmount, Victoria

South Porcupine: TBD   

Wednesday May 12 starting 7:30 AM

South Porcupine: Bloor, Strachan  

Thursday May 13 starting 7:30 AM:

Timmins North: Donna, McClinton, Louise, Emilie, Fay    

Schumacher: Gold Mine, Vipond

Friday May 14 starting 7:30 AM:

Mountjoy: Craig, Lemieux, Lillian, Norman  

Schumacher: Father Costello, Les Hall, Hollinger   

Note on the Plan:

Sweeping Operations will take several weeks to complete. There is a lot of sand to pick up every year, so we ask residents to remain patient. Weather conditions and mechanical issues play a major role in how quickly Public Works can complete the sweeping operations. Heavy rain and subzero temperatures will halt operations.

Posted No Parking Signs Advising Spring Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that Spring Maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for Street Sweeping crews to advance.

Priority Sequence for Street Sweeping Operations:

Day Operation:

Street Sweeping is never done in the area where Sanitation is taken place.

High density residential areas (Older Section of City: one-ways, narrow streets);

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main Arterial Routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department

Posted by Alana Monette  at 1:47 PM
  

Night Time Street Sweeping 9:00 PM to 7:30 AM

From May 2 to May 7, the Public Works Department wishes to inform the public that crews may be doing night time street sweeping

Sunday May 2 starting 12:00 AM:

Connecting Link: King  

Connecting Link: Algonquin (Mountjoy to Theriault)

Monday May 3 starting 12:00 AM:

Connecting Link: Highway 101 E

Connecting Link: Riverside (Mattagami to Joseph)  

Tuesday May 4 starting 12:00 AM:

South Porcupine: Bruce, Main, Harold

Connecting Link: Riverside (Joseph to Shirley)

Wednesday May 5 starting 12:00 AM:

Connecting Link: Bruce Y, Highway 101 E

Connecting Link: Riverside (Shirley to Canadian Tire)

 

Daytime Street Sweeping 7:30 AM to 4:00 PM

From May 2 to May 7, the Public Works Department wishes to inform the public that crews may be doing day time street sweeping

Monday May 3 starting 7:30 AM:

Timmins South: Wende, Montgomery, Columbus   

South Porcupine: Bloor, Golden  

Tuesday May 4 starting 7:30 AM

Timmins North: Blahey, Bartleman, Eyre  

South Porcupine: Strachan, Quebec, Legion   

Wednesday May 5 starting 7:30 AM

Timmins South: Southern, Leblanc, Cody, Delmonte, Coronation, Reliable, Wilcox, Sterling   

South Porcupine: Main, Crawford

Thursday May 6 starting 7:30 AM:

Timmins South: Moneta, Sterling, Balsam, Cedar   

Schumacher: Gold Mine, Vipond

Friday May 7 starting 7:30 AM:

Timmins South: Graham, Cayuga, Seneca, Onedia, Mohawk

Schumacher: Father Costello, Les Hall, Hollinger   

Note on the Plan:

Sweeping Operations will take several weeks to complete. There is a lot of sand to pick up every year, so we ask residents to remain patient. Weather conditions and mechanical issues play a major role in how quickly Public Works can complete the sweeping operations. Heavy rain and subzero temperatures will halt operations.

Posted No Parking Signs Advising Spring Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that Spring Maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for Street Sweeping crews to advance.

Priority Sequence for Street Sweeping Operations:

Day Operation:

Street Sweeping is never done in the area where Sanitation is taken place.

High density residential areas (Older Section of City: one-ways, narrow streets);

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main Arterial Routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department 
Posted by Alana Monette  On May 03, 2021 at 1:45 PM
  

Night Time Street Sweeping 12:00 AM to 7:30 AM

From April 26 to April 30, the Public Works Department wishes to inform the public that crews may be doing night time street sweeping

Monday April 26 starting 12:00 AM:

Connecting Link: Riverside (Joseph to Pavilion)

Tuesday April 27 starting 12:00 AM:

Connecting Link: Algonquin (Highway 655 to Cedar)

Wednesday April 28 starting 12:00 AM:

Connecting Link: Algonquin (Cedar to Mountjoy)

Thursday April 29 starting 12:00 AM:

Connecting Link: Algonquin (Mountjoy to Theriault)

Daytime Street Sweeping 7:30 AM to 4:00 PM

From April 26 to April 30, the Public Works Department wishes to inform the public that crews may be doing day time street sweeping

Monday April 26 starting 7:30 AM:

Timmins South: Belanger, Bannerman, Middleton  

South Porcupine: Fern, Huot, Front

Tuesday April 27 starting 7:30 AM

Timmins North: Fogg, Charles, Avenue, Oak, Ann, Gillies, Willow, Poplar

South Porcupine: William, Cecil, Powell 

Wednesday April 28 starting 7:30 AM

Timmins South: Windsor, Kent, Way  

South Porcupine: Broadway, O’Brien, Essa

Thursday April 29 starting 7:30 AM:

Timmins South: Wende, Montgomery, Columbus  

Schumacher: Delnite

Friday April 30 starting 7:30 AM:

Timmins South: Southern, Leblanc, Cody, Delmonte, Coronation, Reliable, Wilcox, Sterling  

South Porcupine: Dome, Shamrock  

Note on the Plan:

Sweeping Operations will take several weeks to complete. There is a lot of sand to pick up every year, so we ask residents to remain patient. Weather conditions and mechanical issues play a major role in how quickly Public Works can complete the sweeping operations. Heavy rain and subzero temperatures will halt operations.

Posted No Parking Signs Advising Spring Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that Spring Maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for Street Sweeping crews to advance.

Priority Sequence for Street Sweeping Operations:

Day Operation:

Street Sweeping is never done in the area where Sanitation is taken place.

High density residential areas (Older Section of City: one-ways, narrow streets);

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main Arterial Routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department

Posted by Alana Monette  On Apr 23, 2021 at 2:15 PM
  

Daytime Street Sweeping 7:30 am to 4:00 pm

From April 12 to April 16, the Public Works Department wishes to inform the public that crews may be doing day time street sweeping

Monday April 12 starting 7:30 AM:

Timmins South: Maple (Second to Dead end), Elm (Second to Dead end), Birch (Second to Iroquois)

Porcupine: Bob’s Lake, Lamarche, Gervais South, Gauthier, Conley, Jarvi

Tuesday April 13 starting 7:30 AM

Timmins North: Spruce (Sixth to Ross), Cedar (Sixth to Ross), Balsam (Sixth to Dead end)

Porcupine: Marquis, Earl West, Duke West, Boucher, Bellemare, Krznaric, Seguin, Ristimaki   

Wednesday April 14 starting 7:30 AM

Timmins North: Birch (Fifth to Ninth), Maple (Fifth to Ninth), Elm (Fifth to Ninth)

Porcupine: Mildred, Dixon, Haileybury, Remembrance

Thursday April 15 starting 7:30 AM:

Timmins North: Eighth, Ninth

Schumacher: Delnite

Friday April 16 starting 7:30 AM:

Timmins North: Borden, Laurier, Floral, Crescent, Lincoln

Porcupine: Corporation, New, Sutherland, Bristol

Evening Street Sweeping 4:00 PM to 11:30 PM

From April 12 to April 16, the Public Works Department wishes to inform the public that crews may be doing evening street sweeping

Monday April 12 starting 4:30 PM:

Timmins North: Cedar (Ross to Hendry), Balsam (Jubilee to Brousseau), Birch (Jubilee to Brousseau), Maple (Jubilee to Brousseau), Jubilee (Balsam to Cedar)

Porcupine: Kenneth, Earl East, Duke East, Falcon

Tuesday April 12 starting 4:30 PM:

Timmins North: Lavigne, Conrad, Brousseau

Porcupine: Princess, Queen, Lover’s Lane, Percival, Carlos

Wednesday April 12 starting 4:30 PM:

Timmins North: Lincoln, Crescent, O’Neil, Hillside, Belleview

Porcupine: Ruth North, Ottolen, Young North, Rekela North, Division, Florence North

Thursday April 12 starting 4:30 PM:

Timmins North: Cameron, Ann, Pearl, McLeod, Powerline

Porcupine: Rekela South, Ruth South, Henry, Young, Florence South

Friday April 12 starting 4:30 PM:

Timmins North: Laidlaw, Lang, Knox, Dale (Railway to Dead end), Ogden (Railway to Dead end), Rose

South Porcupine: Spillenaar, Tynne, David, Daniel, Grace

Note on the Plan:

Sweeping Operations will take several weeks to complete. There is a lot of sand to pick up every year, so we ask residents to remain patient. Weather conditions and mechanical issues play a major role in how quickly Public Works can complete the sweeping operations. Heavy rain and subzero temperatures will halt operations.

Posted No Parking Signs Advising Spring Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that Spring Maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for Street Sweeping crews to advance.

Priority Sequence for Street Sweeping Operations:

Day Operation:

Street Sweeping is never done in the area where Sanitation is taken place.

High density residential areas (Older Section of City: one-ways, narrow streets);

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main Arterial Routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department

Posted by Alana Monette  On Apr 09, 2021 at 3:04 PM
  
The City’s Public Works Department has begun work to remove sand from the streets, sidewalks, municipal parking lots, and medians across the city. Due to the amount of sand used to contend with our Northern Ontario winters, sweeping operations will take several weeks to complete.

While sweeping operations have begun, they remain weather-dependent as these activities cannot take place when temperatures drop below zero degrees.

Yellow ‘No Parking’ signs are posted on the streets the day prior to sweeping, and indicate the day of the week that operations are to take place. Failure to comply can result in the vehicle being towed or ticketed, and may prevent areas of the street from being cleaned.

A sweeping schedule will be posted weekly on the City’s website, which is subject to last-minute changes based on changes in weather and potential equipment break downs.

We kindly ask residents to comply with the ‘No Parking’ signs as our crews work to clean the streets, reducing the amount of sand and dust throughout the City.
Posted by Amanda Dyer  On Apr 08, 2021 at 9:16 AM
  

Night Time Snow Removal 9:30 PM to 7:30 AM

From March 7 to March 12, 2021, the Public Works Department wishes to inform the public that crews may be doing snow removal in the following areas

Sunday March 7 Starting 9:30 PM:

BIA: Third, Second   

Monday March 8 Starting 9:30 PM:

BIA: Spruce (Sixth to Kirby), Pine (Sixth to Kirby), Cedar (Sixth to Kirby), Balsam (Sixth to Kirby)   

Tuesday March 9 starting 9:30 PM:

BIA: Birch (Sixth to Second), Maple (Sixth to Second), Elm (Sixth to Second)

Wednesday March 10 starting 9:30 PM:

South Porcupine: Bruce, Golden, Harold  

Daytime Snow Removal 7:30 Am to 4:00 PM

From March 7 to March 12, 2021, the Public Works Department wishes to inform the public that crews will be conducting daytime snow removal in the following areas

Monday March 8 Starting 7:30 AM:

Timmins South: Elm (Second to Dead end), Maple (Second to Dead End), Birch (Second to Moneta)

South Porcupine: Front, Huot, Essa

Tuesday March 9 starting 7:30 AM:

Timmins North: Patricia (Ross to Murray), Hart (Ross to Murray), Kay, Murray, Diane, Gordon

South Porcupine: Bloor, Shamrock, Dome

Wednesday March 10 starting 7:30 AM:

Timmins North: Hemlock (Ross to Roche), Roche, Hendry, Tamarack (Ross to Dead end), Mont Sacre Coeur, Cedar (Ross to Hendry)   

South Porcupine: Broadway, O’Brien, Cecil

Thursday March 11 starting 7:30 AM:

Timmins North: Balsam (Ross to Brousseau), Maple (Ross to Brousseau), Jubilee East, Birch (Ross to Brousseau), Lavigne, Conrad

Schumacher: Father Costello, Croatia, Grant, Vipond, Templeton

Friday March 12 starting 7:30 AM:

Timmins South: Cody, Coronation, Tonelli, Delmonte, Reliable, Graham

Schumacher: Dwyer, Fourth, Aura Lake, Battochio, Les Hall, Hollinger

Note on the Plan:

The above plan or parts of the plan may be changed at any time and/or delayed if a winter storm is in effect or related to mechanical issues. The snow removal crew will change to a snow plowing operation. Those streets that may not be done will be done on the next available snow removal shift.

Illegal placement of Snow from Residential Property onto Sidewalk and Road:

A reminder that City BYLAW 1993-4162 does not allow a person to place snow from a person’s property and place onto the road or sidewalk.

Posted No Parking Signs Advising Winter Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that winter maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for snow removal crew to advance.

Winter Parking Ban:

A reminder that the winter parking ban is effect and parking on the street is not permitted on any day, between the hours of 11:30 PM to 7:30 AM, from November 1 through April 30.

Priority Sequence for Snow Removal Operations:

Day Operation:

Snow removal is never done in the area where waste and recycling collection is taken place.

High density residential areas (older section of City: one-ways, narrow streets)

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main arterial routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department
Posted by Alana Monette  On Mar 05, 2021 at 2:06 PM
  

Night Time Snow Removal 9:30 PM to 7:30 AM

From February 28 to March 5, 2021, the Public Works Department wishes to inform the public that crews may be doing snow removal in the following areas

Sunday February 28 Starting 9:30 PM:

Timmins North: Patricia (Ross to Murray), Hart (Ross to Murray), Kay, Murray, Diane, Gordon  

Monday March 1 Starting 9:30 PM:

Timmins North: Hemlock (Ross to Roche), Roche, Hendry, Tamarack (Ross to Dead end), Mont Sacre Coeur, Cedar (Ross to Hendry)   

Tuesday March 2 starting 9:30 PM:

Timmins North: Balsam (Ross to Brousseau), Maple (Ross to Brousseau), Jubilee East, Birch (Ross to Brousseau), Lavigne, Conrad

Wednesday March 3 starting 9:30 PM:

Mountjoy: Bonaventure, Meadow, Majestic, Diamond, Pleasant, Castlewood

Daytime Snow Removal 7:30 Am to 4:00 PM

From February 28 to March 5, 2021, the Public Works Department wishes to inform the public that crews will be conducting daytime snow removal in the following areas

Monday March 1 Starting 7:30 AM:

Timmins North: Rosemarie, Demine, Lalonde, Lois, Lozanne, Renee  

Tuesday March 2 starting 7:30 AM:

Timmins North: Martin, Couture, Malette, Delia, Kelly Ann  

Wednesday March 3 starting 7:30 AM:

Timmins North: Randall, Spooner, Lamminen  

Thursday March 4 starting 7:30 AM:

Timmins South: Elm (Second to Dead end), Maple (Second to Dead End), Birch (Second to Moneta)

Friday March 5 starting 7:30 AM:

Timmins South: Cody, Coronation, Tonelli, Delmonte, Reliable, Graham

Note on the Plan:

The above plan or parts of the plan may be changed at any time and/or delayed if a winter storm is in effect or related to mechanical issues. The snow removal crew will change to a snow plowing operation. Those streets that may not be done will be done on the next available snow removal shift.

Illegal placement of Snow from Residential Property onto Sidewalk and Road:

A reminder that City BYLAW 1993-4162 does not allow a person to place snow from a person’s property and place onto the road or sidewalk.

Posted No Parking Signs Advising Winter Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that winter maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for snow removal crew to advance.

Winter Parking Ban:

A reminder that the winter parking ban is effect and parking on the street is not permitted on any day, between the hours of 11:30 PM to 7:30 AM, from November 1 through April 30.

Priority Sequence for Snow Removal Operations:

Day Operation:

Snow removal is never done in the area where waste and recycling collection is taken place.

High density residential areas (older section of City: one-ways, narrow streets)

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main arterial routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department

Posted by Alana Monette  On Feb 26, 2021 at 1:56 PM
  

Night Time Snow Removal 9:30 PM to 7:30 AM

From February 21 to February 26, 2021, the Public Works Department wishes to inform the public that crews may be doing snow removal in the following areas

Sunday February 21 Starting 9:30 PM:

Mountjoy: Craig, Lillian, Lemieux, Lemoyne, MacDuff, Vanier, Paul, Louis, Leonard, Lynwood, Woodland, Forest  

Monday February 22 Starting 9:30 PM:

Mountjoy: Acres, Camille, Laurentian, Clifford, Greeningdon, Royale   

Tuesday February 23 starting 9:30 PM:
Timmins North: JV Bonhomme, Brian Romain, Mascioli, Argento, Logan Kerr, Ray Caine

Wednesday February 24 starting 9:30 PM:

Mountjoy: Marcel, Phillip, Christine, Chenier, Chantal, Richard, Maurice

Daytime Snow Removal 7:30 Am to 4:00 PM

From February 21 to February 26, 2021, the Public Works Department wishes to inform the public that crews will be conducting daytime snow removal in the following areas

Monday February 22 Starting 7:30 AM:

Porcupine: Boucher, Duke, Krznaric, Earl, Marquis, Seguin, Ristimaki, Gervais North, Conley North

Tuesday February 23 starting 7:30 AM:

Porcupine: Mildred, Dixon, Coott, Haileybury (Coott to Lover’s Lane), Bob’s Lake, Jarvi, Lamarche, Gervais South, Gauthier, Conley South  

Wednesday February 24 starting 7:30 AM:

Timmins North: Richelieu, Rochdale, Simone, University, Melrose

Thursday February 25 starting 7:30 AM:

Timmins North: Donna, Louise, McClinton, Shub, Rheaume, Morandin

Note on the Plan:

The above plan or parts of the plan may be changed at any time and/or delayed if a winter storm is in effect or related to mechanical issues. The snow removal crew will change to a snow plowing operation. Those streets that may not be done will be done on the next available snow removal shift.

Illegal placement of Snow from Residential Property onto Sidewalk and Road:

A reminder that City BYLAW 1993-4162 does not allow a person to place snow from a person’s property and place onto the road or sidewalk.

Posted No Parking Signs Advising Winter Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that winter maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for snow removal crew to advance.

Winter Parking Ban:

A reminder that the winter parking ban is effect and parking on the street is not permitted on any day, between the hours of 11:30 PM to 7:30 AM, from November 1 through April 30.

Priority Sequence for Snow Removal Operations:

Day Operation:

Snow removal is never done in the area where waste and recycling collection is taken place.

High density residential areas (older section of City: one-ways, narrow streets)

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main arterial routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department
Posted by Alana Monette  On Feb 19, 2021 at 1:40 PM
  

Night Time Snow Removal 9:30 PM to 7:30 AM

From February 15 to February 19, 2021, the Public Works Department wishes to inform the public that crews may be doing snow removal in the following areas

Monday February 15 Starting 9:30 PM:

South Porcupine: Bruce, Golden (Legion to Evans), King, Harold

Tuesday February 16 starting 9:30 PM:
Timmins North: Poplar, Willow, Ann, Oak, Fogg (Algonquin to Oak), Avenue (Algonquin to Dead end), Charles, Clouthier

Wednesday February 17 starting 9:30 PM:

Timmins North: Toke, Brousseau

 Daytime Snow Removal 7:30 Am to 4:00 PM

From February 15 to February 19, 2021, the Public Works Department wishes to inform the public that crews will not be completing daytime snow removal.

Note on the Plan:

The above plan or parts of the plan may be changed at any time and/or delayed if a winter storm is in effect or related to mechanical issues. The snow removal crew will change to a snow plowing operation. Those streets that may not be done will be done on the next available snow removal shift.

Illegal placement of Snow from Residential Property onto Sidewalk and Road:

A reminder that City BYLAW 1993-4162 does not allow a person to place snow from a person’s property and place onto the road or sidewalk.

Posted No Parking Signs Advising Winter Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that winter maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for snow removal crew to advance.

Winter Parking Ban:

A reminder that the winter parking ban is effect and parking on the street is not permitted on any day, between the hours of 11:30 PM to 7:30 AM, from November 1 through April 30.

Priority Sequence for Snow Removal Operations:

Day Operation:

Snow removal is never done in the area where waste and recycling collection is taken place.

High density residential areas (older section of City: one-ways, narrow streets)

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main arterial routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department
Posted by Alana Monette  On Feb 16, 2021 at 11:21 AM
  

Night Time Snow Removal 9:30 PM to 7:30 AM

From January 31 to February 5, 2021, the Public Works Department wishes to inform the public that crews may be doing snow removal in the following areas

Sunday January 31 Starting 9:30 PM:

Connecting Link: Algonquin (Mountjoy to Mattagami), Riverside (Mattagami to Norman)

Monday February 1 Starting 9:30 PM:

Timmins North: Denise, Lonergan, Suzanne

Tuesday February 2 starting 9:30 PM:
Connecting Link: Riverside (Norman to Shirley)

Wednesday February 3 starting 9:30 PM:

Connecting Link: Algonquin (Brunette to Highway 655), Highway 101 (Highway 655 to McIntyre)

Daytime Snow Removal 7:30 Am to 4:00 PM

From January 31 to February 5, 2021, the Public Works Department wishes to inform the public that crews will be conducting daytime snow removal in the following areas

Monday February 1 Starting 7:30 AM:

Timmins South: Moneta (Cedar to Mountjoy), Lee, Sterling

South Porcupine: Spillenaar, David, Daniel, Grace, Tynne, Ferguson  

Tuesday February 2 starting 7:30 AM:

Timmins North: Cherry, Burke, Harmony, Howard, Hart (Ross to Murdock), Patricia (Ross to Toke), Leone

Porcupine: Renison, Michener, Girdwood, Bergeron, Clement

Wednesday February 3 starting 7:30 AM

Timmins North: Murdock, Empire, Rochester, John, Lakeshore

Porcupine: Eric, Lawrence, Warner, Walter, Smith, Summers

Thursday February 4 starting 7:30 AM

Timmins North: Seventh, Ninth, Drew

Friday February 5 starting 7:30 AM

Porcupine: Allan, Leighton, Galbraith, McDougall, Laffin

Note on the Plan:

The above plan or parts of the plan may be changed at any time and/or delayed if a winter storm is in effect or related to mechanical issues. The snow removal crew will change to a snow plowing operation. Those streets that may not be done will be done on the next available snow removal shift.

Illegal placement of Snow from Residential Property onto Sidewalk and Road:

A reminder that City BYLAW 1993-4162 does not allow a person to place snow from a person’s property and place onto the road or sidewalk.

Posted No Parking Signs Advising Winter Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that winter maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for snow removal crew to advance.

Winter Parking Ban:

A reminder that the winter parking ban is effect and parking on the street is not permitted on any day, between the hours of 11:30 PM to 7:30 AM, from November 1 through April 30.

Priority Sequence for Snow Removal Operations:

Day Operation:

Snow removal is never done in the area where waste and recycling collection is taken place.

High density residential areas (older section of City: one-ways, narrow streets)

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main arterial routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department
Posted by Alana Monette  On Jan 29, 2021 at 2:02 PM
  

Night Time Snow Removal 9:30 PM to 7:30 AM

From January 24 to January 29, 2021, the Public Works Department wishes to inform the public that crews may be doing snow removal

Sunday January 24 Starting 9:30 PM:

BIA: Spruce (Sixth to Kirby), Pine (Sixth to Kirby), Cedar (Sixth to Kirby), Balsam (Sixth to First)

Monday January 25 Starting 9:30 PM:

BIA: Third (Spruce to Mountjoy), Second (Brunette to Mountjoy)

Tuesday January 25 starting 9:30 PM:

BIA: Birch (Sixth to Second), Maple (Sixth to Second), Elm (Sixth to Second)

Wednesday January 27 starting 9:30 PM:

BIA: Algonquin (Brunette to Mountjoy), Wilson (Mountjoy to Mattagami)

Daytime Snow Removal 7:30 Am to 4:00 PM

From January 25 to January 29, 2021, the Public Works Department wishes to inform the public that crews will be conducting daytime snow removal in the following areas.

Monday January 25 Starting 7:30 AM:

Timmins South: Maple (Second to South of Dale), Elm (Second to South of Dale), Birch (Second to Ogden)

South Porcupine: William, Cecil, O’Brian

Tuesday January 25 starting 7:30 AM:

Timmins North: Hemlock (Fifth to Ross), Tamarack (Fifth to Ross), Spruce ( Sixth to Ross)

South Porcupine: Broadway, Essa, Dome

Wednesday January 27 starting 7:30 AM:

Timmins South: Columbus, Montgomery, Wende, Way

South Porcupine: Fern, Helmer, Hellen

Thursday January 28 starting 7:30 AM:

Timmins South: Kent, Windsor, Middleton, Bannerman

Schumacher: Veterans, Croatia/Brundy (Boundary to Delost), Claimpost, Delost, Prospector, Ennis, Miners, Boundary

Note on the Plan:

The above plan or parts of the plan may be changed at any time and/or delayed if a winter storm is in effect or related to mechanical issues. The snow removal crew will change to a snow plowing operation. Those streets that may not be done will be done on the next available snow removal shift.

Illegal placement of Snow from Residential Property onto Sidewalk and Road:

A reminder that City BYLAW 1993-4162 does not allow a person to place snow from a person’s property and place onto the road or sidewalk.

Posted No Parking Signs Advising Winter Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that winter maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for snow removal crew to advance.

Winter Parking Ban:

A reminder that the winter parking ban is effect and parking on the street is not permitted on any day, between the hours of 11:30 PM to 7:30 AM, from November 1 through April 30.

Priority Sequence for Snow Removal Operations:

Day Operation:

Snow removal is never done in the area where waste and recycling collection is taken place.

High density residential areas (older section of City: one-ways, narrow streets)

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main arterial routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department

Posted by Vickie Boudreau  On Jan 22, 2021 at 1:12 PM
  

The City of Timmins Public Works Department would like to advise the public that a city wide snow plowing operation is planned to begin Thursday, January 22, 2021 at 12:00am.

Crews will be deployed to plow city streets, rural roads, laneways and parking lots across the city. Some rural areas may not be plowed overnight and will be plowed during the daytime hours.

We ask that you DO NOT place your waste carts for collection curb side until 7:30am to reduce the risk of collection disruptions and damages.

We would also like to remind the public that the Winter Parking Ban is in effect. Parking on the street is not permitted on any day between the hours of 11:30 pm to 7:30 am, from November 1 through April 30.

We thank you for your patience and cooperation during this time.

Public Works Department

Posted by Alana Monette  On Jan 21, 2021 at 1:04 PM
  

Night Time Snow Removal 9:30 PM to 7:30 AM

From January 17 to January 22, 2021, the Public Works Department wishes to inform the public that crews may be doing snow removal

Sunday January 17 Starting 9:30 PM:

Mountjoy: Shirley

Timmins North: Theriault, College (Jubilee to Victoria), Waterloo

Monday January 18 Starting 9:30 PM:

Schumacher: Highway 101 E (Highway 655 to Carium)

South Porcupine: Bruce, Main (Strachan to Shamrock)

Tuesday January 19 starting 9:30 PM:

South Porcupine: Harold  

Porcupine: King

Wednesday January 20 starting 9:30 PM:

Timmins North: Toke, James

Timmins South: Brunette, Pine (First to Cemetery)

Daytime Snow Removal 7:30 Am to 4:00 PM

From January 17 to January 22, 2021, the Public Works Department wishes to inform the public that crews will not be completing daytime snow removal.

 

Note on the Plan:

The above plan or parts of the plan may be changed at any time and/or delayed if a winter storm is in effect or related to mechanical issues. The snow removal crew will change to a snow plowing operation. Those streets that may not be done will be done on the next available snow removal shift.

Illegal placement of Snow from Residential Property onto Sidewalk and Road:

A reminder that City BYLAW 1993-4162 does not allow a person to place snow from a person’s property and place onto the road or sidewalk.

Posted No Parking Signs Advising Winter Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that winter maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for snow removal crew to advance.

Winter Parking Ban:

A reminder that the winter parking ban is effect and parking on the street is not permitted on any day, between the hours of 11:30 PM to 7:30 AM, from November 1 through April 30.

Priority Sequence for Snow Removal Operations:

Day Operation:

Snow removal is never done in the area where waste and recycling collection is taken place.

High density residential areas (older section of City: one-ways, narrow streets)

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main arterial routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department

Posted by Alana Monette  On Jan 15, 2021 at 1:51 PM
  

Night Time Snow Removal 9:30 PM to 7:30 AM

From January 10 to January 13, 2020, the Public Works Department wishes to inform the public that crews will not be doing snow removal overnight.

Daytime Snow Removal 7:30 Am to 4:00 PM

From January 5 to January 10, 2020, the Public Works Department wishes to inform the public that crews may be doing snow removal.

Monday January 11 Starting 7:30 AM:

Mountjoy: Bonaventure, Majestic

South Porcupine: Crawford (Golden to Fern), Main (Shamrock to Fern), Moore (Quebec to Fern) 

Tuesday January 12 Starting 7:30 AM:

Timmins North: Elm (Fifth to Ninth), Maple (Fifth to Dead end), Birch (Fifth to Dead end), Fifth (Mountjoy to Cedar)

South Porcupine: Golden, Powell, Huot (Dead end to Essa)

Wednesday January 13 Starting at 7:30 AM:

Timmins North: JV Bonhomme, College (Reg Pope to Westmount), Westmount, Victoria

South Porcupine: Bloor, Legion (Quebec to Fern), Strachan, Quebec

Thursday January 14 Starting at 7:30 AM:

Schumacher: Father Costello, Vipond, Grant, Croatia

Friday January 15 Starting at 7:30 AM:

Schumacher: Dwyer, Fourth, Les Hall, Hollinger Battochio, Aura Lake, Lionscrest

Note on the Plan:

The above plan or parts of the plan may be changed at any time and/or delayed if a winter storm is in effect or related to mechanical issues. The snow removal crew will change to a snow plowing operation. Those streets that may not be done will be done on the next available snow removal shift.

Illegal placement of Snow from Residential Property onto Sidewalk and Road:

A reminder that City BYLAW 1993-4162 does not allow a person to place snow from a person’s property and place onto the road or sidewalk.

Posted No Parking Signs Advising Winter Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that winter maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for snow removal crew to advance.

Winter Parking Ban:

A reminder that the winter parking ban is effect and parking on the street is not permitted on any day, between the hours of 11:30 PM to 7:30 AM, from November 1 through April 30.

Priority Sequence for Snow Removal Operations:

Day Operation:

Snow removal is never done in the area where waste and recycling collection is taken place.

High density residential areas (older section of City: one-ways, narrow streets)

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main arterial routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department
Posted by Alana Monette  On Jan 08, 2021 at 3:41 PM
  

Night Time Street Sweeping 11:30 pm to 7:30 am

From June 7 to June 12, the Public Works Department wishes to inform the public that crews may be doing night time street sweeping

Sunday June 7 Starting 11:30 pm:

Timmins North: Theriault

Monday June 8 Starting 11:30 pm:

Timmins North: Pine, Jubilee

Tuesday June 9 Starting 11:30 pm:

Timmins North: MacLean, Mountjoy

Wednesday June 10 Starting 11:30 pm:

Timmins North: Melrose (Jubilee to Dead End)

Thursday June 11 Starting 11:30 pm:

Timmins South: Pine (Kirby to Evelyn)

Note on the Plan:

Sweeping Operations will take several weeks to complete. There is a lot of sand to pick up every year, so we ask residents to remain patient. Weather conditions and mechanical issues play a major role in how quickly Public Works can complete the sweeping operations. Heavy rain and subzero temperatures will halt operations.

Posted No Parking Signs Advising Spring Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that Spring Maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for Street Sweeping crews to advance.

Priority Sequence for Street Sweeping Operations:

Day Operation:

Street Sweeping is never done in the area where Sanitation is taken place.

High density residential areas (Older Section of City: one-ways, narrow streets);

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main Arterial Routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department

Posted by Alana Monette  On Jun 05, 2020 at 3:07 PM
  
Night Time Street Sweeping 11:30 pm to 7:30 am

From May 31 to June 5, the Public Works Department wishes to inform the public that crews may be doing night time street sweeping

Sunday May 31 Starting 11:30 pm:

Mountjoy: Shirley

Monday June 1 Starting 11:30 pm:

Timmins South: Second, Spruce (Fifth to Moneta)

Tuesday June 2 Starting 11:30 pm:

Timmins South: Pine (Sixth to Kirby), Cedar (Fifth to First), Balsam (Fifth to Frist), Birch (Fifth to Second)

Wednesday June 3 Starting 11:30 pm:

Timmins South: Maple (Fifth to Second), Elm (Fifth to Second), Wilson

Thursday June 4 Starting 11:30 pm:

Timmins South: Mountjoy

Timmins North: Mountjoy, MacLean

Daytime Street Sweeping 7:30 am to 4:00 pm

From May 31 to June 5, the Public Works Department wishes to inform the public that crews may be doing day time street sweeping

Monday June 1 Starting 7:30 am:

Mountjoy: Power, Clifford, Chestnut, Greeningdon, Royale

South Porcupine: Crawford

Tuesday June 2 Starting 7:30 am:

Mountjoy: Joseph, Park

South Porcupine: Main

Wednesday June 3 Starting 7:30 am:

Timmins North: Berridale, Michelano

Thursday June 4 Starting 7:30 am:

Mountjoy: Bonaventure, Meadow, Pleasant, Castlewood, Diamond, Majestic

Friday June 5 Starting 7:30 am:

No sweeping scheduled

Note on the Plan:

Sweeping Operations will take several weeks to complete. There is a lot of sand to pick up every year, so we ask residents to remain patient. Weather conditions and mechanical issues play a major role in how quickly Public Works can complete the sweeping operations. Heavy rain and subzero temperatures will halt operations.

Posted No Parking Signs Advising Spring Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that Spring Maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for Street Sweeping crews to advance.

Priority Sequence for Street Sweeping Operations:

Day Operation:

Street Sweeping is never done in the area where Sanitation is taken place.

High density residential areas (Older Section of City: one-ways, narrow streets);

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main Arterial Routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department
Posted by Alana Monette  On May 29, 2020 at 2:27 PM
  

Night Time Street Sweeping 11:30 pm to 7:30 am

From May 24 to May 29, the Public Works Department wishes to inform the public that crews may be doing night time street sweeping

Sunday May 24 Starting 11:30 pm:

Mountjoy: Riverside (Shirley to Canadian Tire)

Porcupine: King (Gervais to Coott)

Monday May 25 Starting 11:30 pm:

Mountjoy: Shirley

Porcupine: Highway 101 (Coott to Crawford)

Tuesday May 26 Starting 11:30 pm:

Timmins South: Second, Spruce (Fifth to Moneta)

South Porcupine: Harold (Crawford to Legion)

Wednesday May 27 Starting 11:30 pm:

Timmins South: Pine (Sixth to Kirby), Cedar (Fifth to First), Balsam (Fifth to First), Birch (Fifth to Second)

South Porcupine: Bruce, Golden

Thursday May 28 Starting 11:30 pm:

Timmins South: Maple (Fifth to Second), Elm (Fifth to Second), Wilson

South Porcupine: Main (Harold to Strachan)

Daytime Street Sweeping 7:30 am to 4:00 pm

From May 24 to May 29, the Public Works Department wishes to inform the public that crews may be doing day time street sweeping

Monday May 25 Starting 7:30 am:

Mountjoy: Vanier, Center, Lynwood, Woodland, Forest, Frontenac, Champlain

South Porcupine: Warner, Walter, Evans (Dunn to Dead end), Smith (Walther to Tisdale), Leighton, Allan, Mahon

Tuesday May 26 Starting 7:30 am:

Mountjoy: Hudson, Laval, Theodore, Carlton, Brock, Acres

South Porcupine: Dunn (Warner to Tisdale), Evans (Dunn to Station), Tisdale (Langmuir to Goldrush), Galbraith, McDougall, Glenn

Wednesday May 27 Starting 7:30 am:

Timmins South: Commercial, Cloutier, Fogg, Mattagami  

South Porcupine: Lyall, Goldrush (Tisdale to Lyall), Summers, Smith (Summers to Tisdale), Station

Thursday May 28 Starting 7:30 am:

Mountjoy: Gatineau, Viscount, Timcor, Georgian

Friday May 29 Starting 7:30 am:

Mountjoy: Camille, Laurentian, Christine, Chantal, Chenier, Philip, Marcel

South Porcupine: Shamrock (Crawford to Legion), Bloor (Legion to Lakeview), Lakeview

Note on the Plan:

Sweeping Operations will take several weeks to complete. There is a lot of sand to pick up every year, so we ask residents to remain patient. Weather conditions and mechanical issues play a major role in how quickly Public Works can complete the sweeping operations. Heavy rain and subzero temperatures will halt operations.

Posted No Parking Signs Advising Spring Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that Spring Maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for Street Sweeping crews to advance.

Priority Sequence for Street Sweeping Operations:

Day Operation:

Street Sweeping is never done in the area where Sanitation is taken place.

High density residential areas (Older Section of City: one-ways, narrow streets);

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main Arterial Routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department
Posted by Alana Monette  On May 22, 2020 at 12:25 PM
  

Night Time Street Sweeping 11:30 pm to 7:30 am

From May 17 to May 22, the Public Works Department wishes to inform the public that crews may be doing night time street sweeping

Sunday May 17 Starting 11:30 pm:

No Sweeping Scheduled

Monday May 18 Starting 11:30 pm:

Mountjoy: Riverside (Mattagami to Joseph)

Schumacher: Highway 101 (McIntyre to Carium)

Tuesday May 19 Starting 11:30 pm:

Mountjoy: Riverside (Joseph to Shirley)

South Porcupine: Harold (Legion to Bruce), Bruce (Harold to Legion)

Wednesday May 20 Starting 11:30 pm:

Mountjoy: Riverside (Shirley to Canadian Tire)

South Porcupine: Harold (Legion to Crawford), Highway 101 (Crawford to Bristol)

Thursday May 21 Starting 11:30 pm:

Mountjoy: Shirley

Porcupine: King (Bristol to Gervais)

Daytime Street Sweeping 7:30 am to 4:00 pm

From May 17 to May 22, the Public Works Department wishes to inform the public that crews may be doing day time street sweeping

Monday May 18 Starting 7:30 am:

No Sweeping Scheduled

Tuesday May 19 Starting 7:30 am:

South Porcupine: William, Cecil, Powell

Wednesday May 20 Starting 7:30 am:

South Porcupine: O’Brien, Broadway, Essa (Moore to Crawford)

Thursday May 21 Starting 7:30 am:

South Porcupine: Shaw Creek, Gold Mine

Friday May 22 Starting 7:30 am:

South Porcupine: Dome (Moore to Crawford), Shamrock (Legion to Crawford), Bloor

Evening Street Sweeping 4:00 pm to 11:30 pm

From May 17 to May 22, the Public Works Department wishes to inform the public that crews may be doing evening street sweeping

Monday May 18 Starting 4:30 pm:

No Sweeping Scheduled

Tuesday May 19 Starting 4:30 pm:

Mountjoy: Craig, Lillian, Lemieux, Paul/Lois, Lemoyne, MacDuff, Leonard, School

Wednesday May 20 Starting 4:30 pm:

Timmins South: Windsor, Way, Wende, Montgomery

Thursday May 21 Starting 4:30 pm:

Timmins North: Denise, Cameron (Vimy to Theriault), Ann (Cameron to Dead end), McLeod

Friday May 22 Starting 4:30 am:

Mountjoy: Vanier, Center, Lynwood, Woodland, Forest, Frontenac, Champlain

Note on the Plan:

Sweeping Operations will take several weeks to complete. There is a lot of sand to pick up every year, so we ask residents to remain patient. Weather conditions and mechanical issues play a major role in how quickly Public Works can complete the sweeping operations. Heavy rain and subzero temperatures will halt operations.

Posted No Parking Signs Advising Spring Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that Spring Maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for Street Sweeping crews to advance.

Priority Sequence for Street Sweeping Operations:

Day Operation:

Street Sweeping is never done in the area where Sanitation is taken place.

High density residential areas (Older Section of City: one-ways, narrow streets);

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main Arterial Routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department

Posted by Alana Monette  On May 15, 2020 at 2:11 PM
  

Night Time Street Sweeping 11:30 pm to 7:30 am

From May 10 to May 15, the Public Works Department wishes to inform the public that crews may be doing night time street sweeping

Sunday May 10 Starting 11:30 pm:

Timmins South: Algonquin (Preston to Mattagami)

Schumacher: Highway 101 (Highway 655 to McIntyre)

Monday May 11 Starting 11:30 pm:

Mountjoy: Riverside (Mattagami to Joseph)

Schumacher: Highway 101 (McIntyre to Carium)

Tuesday May 12 Starting 11:30 pm:

Mountjoy: Riverside (Joseph to Shirley)

Timmins North: Ross, Jubilee

Wednesday May 13 Starting 11:30 pm:

Mountjoy: Riverside (Shirley to Canadian Tire)

Timmins North: Pine (Mont Sacre Coeur to Fifth)

Thursday May 14 Starting 11:30 pm:

Mountjoy: Shirley

Porcupine: King (Gervais to Bristol)

Daytime Street Sweeping 7:30 am to 4:00 pm

From May 10 to May 15, the Public Works Department wishes to inform the public that crews may be doing day time street sweeping

Monday May 11 Starting 7:30 am:

Timmins South: Balsam (First to Ogden), Cedar (First to Ogden), Kimberly

Schumacher: Croatia (Battochio to Boundary), Lions Crest, Grant  

Tuesday May 12 Starting 7:30 am:

Timmins North: Martin, Delia, Couture, Jean, Malette, Suzanne

Schumacher: Dwyer, Vipond (Templeton to Father Costello), Templeton

Wednesday May 13 Starting 7:30 am:

Timmins South: Spruce (Kirby to Snow dump), Dale (Spruce to Mountjoy), Ogden (Spruce to Birch)

Mountjoy: Craig, Lillian, Lemieux, Paul/Louis, Lemoyne, MacDuff, Leonard, School

Thursday May 14 Starting 7:30 am:

Timmins South: Belanger, Commercial, Bannerman

Schumacher: Fourth, Battochio, Aura Lake

Friday May 15 Starting 7:30 am:

Timmins South: Middleton, Windsor, Kent, Way

Schumacher: Croatia (Boundary to Brundy), Brundy (Croatia to Delost), Carium, Goldale

Evening Street Sweeping 4:00 pm to 11:30 pm

From May 10 to May 15, the Public Works Department wishes to inform the public that crews may be doing evening street sweeping

Monday May11 Starting 4:30 pm:

Timmins North: Shub, Rheaume, Morandin, Demine, Lalonde, Rose Marie, Lois

Tuesday May 12 Starting 4:30 pm:

Timmins North: Lozanne, Renee Place, Kelly Ann, Lonergan

Wednesday May 13 Starting 4:30 pm:

Timmins North: Belleview, Hillside, O’Neil, Pearl, Cameron, McLeod, Powerline

Thursday May 14 Starting 4:30 pm:

Timmins North: Waterloo (Jubilee to Vimy), Rea (Jubilee to Powerline), Jade (Rea to Melrose), George, Quartz

Friday May 15 Starting 4:30 am:

Timmins South: Cedar (Moneta to Sterling), Balsam (Moneta to Sterling), Maple (Moneta to Sterling), Elm (Moneta to Sterling), Moneta (Cedar to Sterling), Lee

Note on the Plan:

Sweeping Operations will take several weeks to complete. There is a lot of sand to pick up every year, so we ask residents to remain patient. Weather conditions and mechanical issues play a major role in how quickly Public Works can complete the sweeping operations. Heavy rain and subzero temperatures will halt operations.

Posted No Parking Signs Advising Spring Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that Spring Maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for Street Sweeping crews to advance.

Priority Sequence for Street Sweeping Operations:

Day Operation:

Street Sweeping is never done in the area where Sanitation is taken place.

High density residential areas (Older Section of City: one-ways, narrow streets);

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main Arterial Routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department
Posted by Alana Monette  On May 08, 2020 at 2:44 PM
  

Night Time Street Sweeping 11:30 pm to 7:30 am

From May 3 to May 8, the Public Works Department wishes to inform the public that crews may be doing night time street sweeping

Sunday May 3 Starting 11:30 pm:

Timmins South: Algonquin (Preston to Mattagami)

Porcupine: King (Gervais to Bristol)

Monday May 4 Starting 11:30 pm:

Mountjoy: Riverside (Mattagami to Joseph)

Porcupine: Highway 101 (Bristol to Crawford)

Tuesday May 5 Starting 11:30 pm:

Mountjoy: Riverside (Joseph to Shirley)

South Porcupine: Harold (Crawford to Legion)

Wednesday May 6 Starting 11:30 pm:

Mountjoy: Riverside (Shirley to Canadian Tire)

South Porcupine: Harold (Legion to Bruce), Bruce (Harold to Legion)

Thursday May 7 Starting 11:30 pm:

Mountjoy: Shirley

Schumacher: Highway 101 (Carium to Highway 655)

Daytime Street Sweeping 7:30 am to 4:00 pm

From May 3 to May 8, the Public Works Department wishes to inform the public that crews may be doing day time street sweeping

Monday May 4 Starting 7:30 am:

Timmins South: Elm (Second to Dead end), Maple (Second to Dead end), Birch (Second to Moneta)

South Porcupine: Bergeron, Renison, Girdwood, Eric, Viola

Tuesday May 5 Starting 7:30 am:

Timmins North: Birch (Fifth to Dead end), Maple (Fifth to Dead end), Elm (Fifth to Dead end)

South Porcupine: Michener, Clement, Lawrence, Ferguson

Wednesday May 6 Starting 7:30 am:

Timmins North: Fifth (Both sections), Seventh

South Porcupine: Julie, Sony, Nadine, Hellen, Helmer

Thursday May 7 Starting 7:30 am:

Timmins North: Eighth, Ninth

Schumacher: Father Costello, Les Hall, Hollinger

Friday May 8 Starting 7:30 am:

Timmins North: Borden, Laurier, Floral, Crescent, Lincoln

Schumacher: Lion’s Crest, Grant, Croatia (Battochio to Boundary)

Evening Street Sweeping 4:00 pm to 11:30 pm

From May 3 to May 8, the Public Works Department wishes to inform the public that crews may be doing evening street sweeping

Monday May 4 Starting 4:30 pm:

Timmins North: Diane, Murray, Gordon, Hemlock, Roche

Tuesday May 5 Starting 4:30 pm:

Timmins North: Tamarack (Ross to Dead end), Spruce (Ross to Brousseau and Hendry to Dead end), Pine (Ross to End), Hendry, Mont Sacre Coeur 

Wednesday May 6 Starting 4:30 pm:

Timmins North: Cedar (Ross to Hendry), Balsam (Jubilee to Brousseau), Birch (Jubilee to Brousseau), Maple (Jubilee to Brousseau), Jubilee (Balsam to Cedar), Brousseau

Thursday May 7 Starting 4:30 pm:

Timmins North: Carlin, Polaris, Quartz, George, Jade

Friday May 8 Starting 4:30 am:

Timmins North: Belleview, Hillside, O’Neil, Pearl, Cameron, McLeod, Powerline

Note on the Plan:

Sweeping Operations will take several weeks to complete. There is a lot of sand to pick up every year, so we ask residents to remain patient. Weather conditions and mechanical issues play a major role in how quickly Public Works can complete the sweeping operations. Heavy rain and subzero temperatures will halt operations.

Posted No Parking Signs Advising Spring Maintenance:

Public Works would like to remind residents that yellow No Parking Signs will be posted to notify that Spring Maintenance will be taking place for daytime operations. Vehicles not complying with these No Parking signs will be ticketed and towed to allow for Street Sweeping crews to advance.

Priority Sequence for Street Sweeping Operations:

Day Operation:

Street Sweeping is never done in the area where Sanitation is taken place.

High density residential areas (Older Section of City: one-ways, narrow streets);

Low density residential areas

Night Operation:

Highway sections;

High density commercial sections;

Main Arterial Routes

Safety:

A reminder to respect safety signage as the safety of workers is very important.  

We thank you for your cooperation in this matter.

Public Works Department

Posted by Ashish Puri  On May 04, 2020 at 1:24 PM
  
1  2  3  4 
 
  • © 2018 City of Timmins. All Rights Reserved.