Water Control for Connecting Link Segment 13 – Environmental Service – May 7, 2026 

The City of Timmins, Environmental Services Department, wishes to advise the public of scheduled water control testing for Connecting Link Segment 13 construction within the following area:

South Porcupine Area:
Highway 101 E. between Bristol Rd. and Ruth St.

Date and Time of Disruption:
May 7, 2026, from 9:30 a.m. to 10:00 a.m.

Once shutdown, and if testing is successful, the water will only be “OFF” for 10 to 15 minutes.  Once control is confirmed, water will be restored to normal.

This work is being done to prepare for construction on Segment 13 of the Connecting Link. Environmental Services is testing the water valves to ensure they can get proper control for upcoming work. An update will be provided once a construction start time has been confirmed.

During the date and time of the disruption, homeowners and businesses may experience short-term loss in water and pressure, or experience brown or rust-coloured water. It is recommended not to drink or wash laundry with the discoloured water. While it is not harmful to your health, it can stain laundry. Should this occur, it is advised to turn off your tap for 10-20 minutes in order to allow crews to finish. Once the work is completed, turn on the COLD water tap closest to the source (usually your laundry tub tap) and let it run for approximately 15-20 minutes or until the water colour has returned to normal.

Environmental Service Department would like to thank residents for their patience and cooperation during this work.

Posted by Sara Perron On 5/6/2026 at 4:08 PM  

 
Content Alert Subscription
    RSSSpaceBlog Feeds
  • © 2018 City of Timmins. All Rights Reserved.