May 2026 - Posts
Please be advised that the Environmental Services Department is continuing bulk item collection within the following areas that was scheduled for today.
Area:
• All areas South of Algonquin Blvd., starting at Mattagami River, working east to Railway St., including Dalton Rd. (up until the end of the asphalt)
Collection efforts are on-going and may take additional time to complete due to volume and operational requirements. Residents are asked to leave their items at the curb, and crews will return to collect remaining materials as work progresses.
Please note: All areas North of Ross & Jubilee, Starting at Airport Road (including rural areas) and working east to HWY 655 have been completed.
We understand this may cause some inconvenience and appreciate your patience as we work to complete the collection. Updates will be provided as needed.
Thank you for your understanding
Sara Perron
The following municipal services will be closed or unavailable on Victoria Day, Monday, May 18, 2026:
- Service Timmins and Provincial Offences Office closed
- NO household waste collection. Monday’s collection will be completed on Tuesday, May 19, 2026.
- Deloro Landfill will be closed
- NO Timmins Transit bus service
- Timmins Museum: NEC closed
- Both branches of the Timmins Public Library closed
- The Archie Dillon Sportsplex Pool closed
- Timmins Economic Development closed
For more information about municipal services visit www.timmins.ca or call Service Timmins at 705-264-1331.
Amanda Dyer
Please be advised that the Environmental Services Department is continuing bulk item collection within the following areas that was scheduled for today.
Area:
• All areas North of Ross Ave & Jubilee Ave; Starting at Airport Rd (including rural areas) and working east to HWY 655
Collection efforts are ongoing and may take additional time to complete due to volume and operational requirements. Residents are asked to leave their items at the curb, and crews will return to collect remaining materials as work progresses.
We understand this may cause some inconvenience and appreciate your patience as we work to complete the collection.
Please note that those areas east of college street have been completed.
Updates will be provided as needed.
Thank you for your understanding.
Sara Perron
Please be advised that the Environmental Services Department is continuing bulk item collection within the following areas that was scheduled for today.
Areas:
- North of Ross & Jubilee, Starting at Airport Road (including rural areas) and working east to HWY 655
Collection efforts are ongoing and may take additional time to complete due to volume and operational requirements. Residents are asked to leave their items at the curb, and crews will return to collect remaining materials as work progresses.
We understand this may cause some inconvenience and appreciate your patience as we work to complete the collection.
Please note that all of Schumacher through Gold Centre and all areas of on and off Goldmine Rd. (Carium Rd., Delnite, MacDonald Hill, and Buffalo Ankerite) had been completed.
Updates will be provided as needed.
Thank you for your understanding.
Sara Perron
Click to download job description
TFT Registered Nurse
How to apply
To apply for this position, please submit your cover letter/resume to the Human Resources Department by 4:00 pm on the closing date of May 22, 2026.
APPLY NOW
AnneMarie Fournier
Click to download job description
FT Municipal Law Enforcement Officer
How to apply
To apply for this position, please submit your cover letter/resume to the Human Resources Department by 4:00 pm on the closing date of May 22, 2026.
APPLY NOW
AnneMarie Fournier
Timmins, ON – City of Timmins Public Works is declaring changes to the street sweeping schedule for the week of May 11, 2026.
Areas being affected due to operational issues:
Monday, May 11, 2026
Night Shift Timmins – scheduled– McIntyre Roads, Schumacher Highway – 655 to Carium Rd. will be re-scheduled for a later date.
We thank you for your cooperation in this matter.
Becky Cashmore
Traffic controls and site mobilization will begin this week along Hwy. 101 E. between Crawford St. and the Porcupine Mall. Motorists should be prepared for lane reductions and reduced speeds when travelling through active work zones.
This is year two of the 2-year project to reconstruct the highway heading eastbound to the Porcupine River Bridge. Construction is anticipated to be completed this fall.
Segment 13 of the Connecting Link project includes full asphalt restoration, drainage improvements, street lights, and traffic signal upgrades. A larger watermain is also being installed to increase capacity in the City’s water distribution system. The new sidewalk between Crawford St. and the Porcupine Mall will be added this summer to improve safety and walkability along the busy corridor.
Like last year, this year’s construction will require lane reductions only. During the first phase of work, traffic will be shifted to the SOUTH side of the highway. Motorists should expect minor delays. Access to the Porcupine Mall and all businesses on the north side of Hwy. 101 E. will be maintained.
Residents can expect regular construction updates as work progresses. For more information on the Connecting Link, visit: https://timmins.hosted.civiclive.com/our_services/engineering/connecting_links/2025-2026_-_segment_13.
Amanda Dyer
Traffic controls and site mobilization will begin this week along Hwy. 101 E. between Crawford St. and the Porcupine Mall. Motorists should be prepared for lane reductions and reduced speeds when travelling through active work zones.
This is year two of the 2-year project to reconstruct the highway heading eastbound to the Porcupine River Bridge. Construction is anticipated to be completed this fall.
Segment 13 of the Connecting Link project includes full asphalt restoration, drainage improvements, street lights, and traffic signal upgrades. A larger watermain is also being installed to increase capacity in the City’s water distribution system. The new sidewalk between Crawford St. and the Porcupine Mall will be added this summer to improve safety and walkability along the busy corridor.
Like last year, this year’s construction will require lane reductions only. During the first phase of work, traffic will be shifted to the SOUTH side of the highway. Motorists should expect minor delays. Access to the Porcupine Mall and all businesses on the north side of Hwy. 101 E. will be maintained.
Residents can expect regular construction updates as work progresses. For more information on the Connecting Link, visit: https://timmins.hosted.civiclive.com/our_services/engineering/connecting_links/2025-2026_-_segment_13.
Amanda Dyer
Nighttime, Start and Finish between 9:00pm to 7:00am the next day
Daytime, Start and Finish between 7:30am to 4:00pm
Sunday, May 10 - Night
Riverside Dr. – Shirley St. to Canadian Tire
Monday, May 11 - Night
McIntyre Roads
Schumacher Highway – 655 to Carium Rd.
Tuesday, May 12 - Night
Bruce Y
Harold Ave – Beer Store to Crawford St.
Wednesday, May 13 - Night
King St. – Porcupine Bridge to Conley St.
Hwy 101 East – Lawrence St. to Crawford St.
Monday, May 11 - Day
Bob’s Lake Dr.
Bonaventure Dr.
Castlewood Ave.
Chenier Ave.
Conley St. S.
Diamond Ct.
Gervais St. S.
Jarvi St.
Lamarche St.
Majestic Dr.
Maurice St.
Meadow Ln.
Pleasant Ave.
Richard Cres.
Tuesday, May 12 - Day
Burke St.
Collins Crt.
Conley St. N.
Duke St. E.
Earl St. E.
Harmony St.
Hart St. – Murdock Ave. to Ross Ave.
Howard Ave.
Leone Ave.
Kenneth Cres.
Patricia Blvd. – Eighth Ave. to Ross Ave.
Wednesday, May 13 - Day
Cherry St.
Empire Ave.
Gervais St.
Hemlock St.
Murdock Ave.
Princess St.
Ristimaki St.
Seguin St.
Thursday, May 14 - Day
Battochio St.
Fourth Ave.
Templeton Ave.
Vipond Rd.
Tamarack St. – Fifth Ave. to Ross Ave.
Spruce St. – Sixth Ave. to Ross Ave.
Eighth Ave. – Toke St. to Pine St.
Friday, May 15 - Day
Balsam Ave. – Fifth Ave. to End
Bellemare St.
Boucher St.
Cedar St. – Fifth Ave. to Ross Ave.
Drew Ave.
Duke St. W
Krznaric St.
Queen St.