Mattagami Water Pollution Control Plant Secondary Bypass Report – April 15, 2026  

The City of Timmins, Environmental Services Department wishes to advise the public of Mattagami Water Pollution Control Plant Raw Overflow Report.

Address: 551 Airport Road
Start date: April 15, 2026
Start time: 6:00 PM
End date: April 15, 2026 
End time: 8:47 PM
Volume by-passed: 668.812 m3

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system.

Residents can help by conserving water by delaying or limiting unnecessary usage such as laundry, taking long showers or running the dishwasher during rain storms. You can also help by keeping our pipes clear - no wipes in the pipes!

To learn more about how the system works and what actions you can take please visit: https://www.timmins.ca/cms/one.aspx?portalId=11976429&pageId=20229538

City staff would like to thank residents for their assistance in reducing water usage during this time.


Posted by Cyndee Villeneuve at 2:24 PM  

 
  • © 2018 City of Timmins. All Rights Reserved.