Bruce Ave. Bridge Replacement

Bruce Ave Bridge

Location: 800m south east of the intersection of Bruce Ave. and Highway 101 East
Value: $1,468,423.00
Contractor: HugoMB Contracting Inc.
Completion: Fall 2022
Status: Awarded
Project Manager: Scott Collin
Email: [email protected]
Phone: (705) 360-2600 Ext: 4513
On-Site Inspector: Lea Consulting Ltd.

Project Details:
The bridge is a single span concrete structure complete with concrete abutments. The City of Timmins has determined that the structure needs to be replaced with a new bridge as per a 2021 structural review that was completed by Associated Engineering.

Along with Bruce Ave. Bridge replacement, the pedestrian bridge located 16.5m north will be removed. The proposed Bruce Ave. Bridge will be constructed with a concrete sidewalk and the existing sidewalk will be re-routed to match the proposed alignment to accommodate pedestrian traffic.